Yes you can, just make sure that the surface is clean, dry and free from dirt or other loose materials.
For new render, allow a minimum 2 week drying time before tiling commences.
Full details can be found on the Technical Datasheet.
0
0
Was this article helpful?
0 out of 0 found this helpful
Articles in this section
- How quickly after tiling with DUNLOP RX-3000 can I grout?
- Once I’ve applied DUNLOP RX-3000 to the wall, how long have I got to fix tiles?
- How much coverage will I get from a 15kg tub of DUNLOP RX-3000?
- Can I tile onto plasterboard using DUNLOP RX-3000?
- Can I tile onto plaster using DUNLOP RX-3000?
- Can I tile onto existing tiles using DUNLOP RX-3000?
- Can I tile onto cement:sand render using DUNLOP RX-3000?
- What tiles can I fix when using DUNLOP RX-3000?
- Where can I use DUNLOP RX-3000?
- What’s the benefit of using a ready mixed adhesive over a powder adhesive?
Add comment
Article is closed for comments.